CONSTRUCTABILITY
AT WORK
At F3 Timber Technologies we create and assist with connection design and installation strategies for mass timber systems.
We also distribute fasteners, connectors, rigging and temporary bracing from several European manufacturers; Schmid Schrauben, Sherpa Connectors, Pewag, Fisch and Stedox.
We strive for simplicity, practicality and elegance in design, manufacturing, and installation. Achieving this will ensure cost effective solutions that are both simple to install and aesthetically pleasing.
OUR PRODUCT
DESIGNS in action
CALL US
Let’s work together
Let’s work together
EXPLORE OUR
INNOVATIONS at work
Google MT1
Construction has completed in Sunnyvale, on a Google office building that totals 182,500 square feet. The F3TT products used on this project were the BRGN PL81, BRGN PL82 and the CRUX BKT1. The BRGN PL81, our original version, was used to hoist all CLT panels (max...
Malahat Skywalk
The Malahat Skywalk is an accessible 600m elevated wooden pathway and treetop walk through an arbutus forest. The approximately $15-million project included 40 meter columns which required a strong, precise and simple to install connection at the base. Our Glued Rod...
Esquimalt Town Square
Esquimalt Town Square is a new condo development by Aragon Properties Ltd in Victoria, BC. CRUX Brackets and cables used horizontally to create a temporary diaphragm, anchored to the concrete core, enabling the installation crew to raise the glulam frame to L4 before...
UBC Brock Commons Tallwood House Project
Brock Commons is a newly built residence on UBC campus. It is home to Tallwood house which is currently the tallest mass timber building in the world. For this project, 9500 square foot 5 ply CLT floor plates (29 panels on 3 trucks) were hoisted into place using our...
UBC Baseball
The UBC Baseball Rose Indoor Training Centre is home to the UBC Thunderbirds Baseball Team and is a state-of-the-art indoor training facility located on UBC campus. For this project 56 foot long x 34 foot tall LSL walls, connected to glulam columns, were tilted up...
GET IN TOUCH
CONTACT US
A-33771 George Ferguson Way, Abbotsford, BC, V2S 2M5
form.fit.function@f3timbertech.com
(604) 330-0993 ext. #333